Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 12 results ...

Echeverry, D, Ibbs, C W and Burati, J (1988) Graduated Unit Price Payment Schedules. Journal of Construction Engineering and Management, 114(01), 1–18.

Griffis, F H & and Butler, F M (1988) Case for Cost‐Plus Contracting. Journal of Construction Engineering and Management, 114(01), 83–94.

Grimm, C T (1988) Brick Masonry Workmanship Statistics. Journal of Construction Engineering and Management, 114(01), 147–9.

Kashiwagi, K, Rubin, R A and Harris, M R (1988) Construction Law and Practice in Japan. Journal of Construction Engineering and Management, 114(01), 104–13.

Kirby, J G, Furry, D A and Hicks, D K (1988) Improvements in Design Review Management. Journal of Construction Engineering and Management, 114(01), 69–82.

Loper, J H, Marquis, E L and Rhomberg, E J (1988) Precast Prestressed Long‐Span Bridges. Journal of Construction Engineering and Management, 114(01), 95–103.

Martin, G L (1988) Training Programs for Engineering Consulting Firms. Journal of Construction Engineering and Management, 114(01), 121–32.

Rajagopalan, K S (1988) Supports for Traveling Cranes: Case History. Journal of Construction Engineering and Management, 114(01), 114–20.

  • Type: Journal Article
  • Keywords: Cranes; Subsurface investigations; Soil conditions; Case reports; Supports;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1988)114:1(114)
  • Abstract:
    Tight sight conditions and a short construction schedule necessitated the use of two travelling cranes during the construction of a hotel. Steep slopes at the south and basement walls at the north posed interesting structural design challenges for these crane supports. Problems encountered in the selection of the crane system and the design of its supports are described; the solutions to these problems are illustrated.

Russell, A D and Caselton, W F (1988) Extensions to Linear Scheduling Optimization. Journal of Construction Engineering and Management, 114(01), 36–52.

Sherman, P J (1988) Japanese Construction R&D: Entrée into U.S. Market. Journal of Construction Engineering and Management, 114(01), 133–43.

Skibniewski, M and Hendrickson, C (1988) Analysis of Robotic Surface Finishing Work on Construction Site. Journal of Construction Engineering and Management, 114(01), 53–68.

Tatum, C B and Funke, A T (1988) Partially Automated Grading: Construction Process Innovation. Journal of Construction Engineering and Management, 114(01), 19–35.